πŸ”§ How to Install Roof Underlayment (Step-by-Step DIY Tutorial)

Installing roof underlayment correctly is one of the most important steps in any roofing project. It acts as a secondary waterproof barrier beneath your shingles, protecting the roof deck from wind-driven rain and ice dams. This professional guide walks you through every stage β€” from preparation to sealing β€” using affordable, high-quality materials.

πŸͺš Tools & Materials Needed

Before you begin, gather these essential tools and materials to ensure a safe and efficient installation:

  • πŸ”« Roofing stapler or hammer tacker – for securing underlayment rolls
  • 🧻 Underlayment rolls – synthetic or asphalt felt (choose high-quality tear-resistant brands)
  • πŸ”ͺ Utility knife – to trim sheets neatly along eaves and ridges
  • πŸ“ Chalk line & tape measure – for straight, accurate overlap lines
  • πŸͺ› Roofing nails or cap staples – corrosion-resistant fasteners every 6–8 inches
  • 🧴 Roofing sealant or adhesive – to reinforce penetrations around vents and valleys

πŸ”§ Recommended Roofing Tools & Supplies

Disclosure: This section contains affiliate links. As an Amazon Associate, we earn a small commission from qualifying purchases β€” helping us keep SmartRoofingCalculator free to use.

Tajima SLANT Angle Meter
Durable steel angle meter for quick degree and slope readings.
View on Amazon
Liquid Rubber Roof Sealant
Flexible water-based coating ideal for flat roofs, gutters, and waterproofing.
View on Amazon
Ansgery Ladder Roof Hooks
Heavy-duty ladder roof hooks with rubber grips for secure positioning.
View on Amazon

πŸ“‹ Step-by-Step Installation Process

  1. 1. Prepare the roof deck.
    Sweep away debris, old nails, and dust. The surface should be clean, smooth, and completely dry.
  2. 2. Start at the eave edge.
    Position your first roll horizontally along the eave, leaving a 1/4-inch overhang past the drip edge. Secure the lower edge first to hold it in place.
  3. 3. Establish your overlap spacing.
    Each new course should overlap the previous one by 4 inches minimum (or follow the manufacturer’s printed guide lines). Use a chalk line for alignment.
  4. 4. Fasten the underlayment.
    Drive nails or cap staples every 6–8 inches horizontally and every 12 inches vertically. Keep fasteners at least 1 inch from edges to prevent tearing.
  5. 5. Continue toward the ridge.
    Work upward, overlapping each layer as you go. Stagger end seams between rows to prevent weak points where water could enter.
  6. 6. Seal penetrations and valleys.
    Apply a generous bead of roofing sealant around vent pipes, skylights, and valleys for added protection against leaks.
  7. 7. Inspect and finalize.
    Once complete, check for wrinkles or exposed nails. The surface should be smooth, tight, and ready for shingle installation.

πŸ’‘ Pro Tips for a Long-Lasting Underlayment

  • Choose synthetic underlayment for superior slip resistance and UV stability.
  • Always start on the down-slope and overlap downwind for best weatherproofing.
  • Use stainless or galvanized fasteners to avoid rust stains under shingles.
  • Store extra rolls in a dry area β€” moisture can weaken adhesive backings.

⚠️ Safety Reminder

Roof work should only be performed in dry, calm weather conditions. Always use a secured ladder, wear non-slip boots, and consider a safety harness for slopes above 6/12 pitch.